RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints1×Red flagRed flag
Land conversionNot verified yet
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the landNot checked
Cases on the builderNo cases
RERA complaints1 case
Builder's other projectsNo cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Forfeiture, agreementNot verified yet
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Not verified yet
Payments
Payment plan
Not verified yet
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Location & risks
What is the location like?
Review2 to review
Height above nearest drainNot verified yet
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedSelf developmentDeclared by the promoter
Metro, operational3.7 kmBeratena Agrahara
The site
Construction & progress
How is it being built, and when will it be ready?
CompletionCompleted
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Completed
Work left
By component
Completed
Quarterly return
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldCompleted
Sold in the latest quarterCompleted
Funding
Estimated cost
Not verified yet
Cost left vs buyer dues
Not verified yet
Form 4
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed72On K-RERA
Available72100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
Available
Filed 10 Dec 20195 pagesAvailable
2 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 11 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
A 400 kV line passes 20 m from the filed location: close enough that its corridor may cross the site
!Review
Nearest government-flagged flood location
1.9 km, Doddakannelli
Height above nearest drain
Not verified yet
Flooding
Site vs nearest drain
Nearest storm drain
680 m to the south, tertiary drain
Nearest lake, tank or pond
550 m to the south, an unnamed tank
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Anekal taluk average
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
Water at a glance
Groundwater
Anekal taluk average, July 2023: 21.3 m below ground
What it means
Not verified yet
Water below ground
21.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Self development
Nearest city water main
1.6 km
!Review
Distances
Within 3 km
Connectivity
Road distance from the site
Nuisances
Distance from the site
Completed
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
Not verified yet
RERA completion date
8 Jan 2022
Work began, as filed
8 Apr 2019
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of 10 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Birla Evara, price locked; Assetz Ren & Rei, price locked; 63 Degree East - Tower E, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Mana Jardin Neo, price locked; Satori Residence By Genurise, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Adarsh Rosewood, price locked.
This project
Padlock: that project's price is part of its own report