Environmental clearanceIssued 10 Jan 2018Filed as SEIAA, p. 1
Available
Available
2 factsAvailable
3 factsAvailable
Available
Available
Available
2 factsAvailable
Available
Available
Available
Available
Available
Available
Available
Source: K-RERA project page and the documents filed there, as read by us. 5 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Reflections in the interactive atlas
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
The matched land is part of a survey number. KGIS holds only the whole number, so its neighbours are not this land's.
Encumbrance certificate filed with K-RERA
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
Not verified yet
Water below ground
27.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
100 m
Distances
Within 3 km
Connectivity
Road distance from the site
Nuisances
Distance from the site
Lapsed
Quarterly return
Lapsed
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
30 Mar 2023
RERA completion date
1 Jan 2025
×Red flag
Work began, as filed
2 Apr 2018
Specified structure
What the promoter specified · not an inspection
Structure
Not verified yet
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
63.2 m (Block A, Block C), 60.75 m (Block B) on the fire NOC
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹59.56 Cr 19.9%Development · ₹239.82 Cr 80.1%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹299.38 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold
Lapsed
Flats sold per quarter
Lapsed
K-RERA inventory
Lapsed
Compliance
Escrow
Lapsed
Escrow and filings
Escrow bank
HDFC · Fort Branch
Designated account, collected
Not verified yet
Designated account, withdrawn
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
8
Track record
Average schedule slip
Not verified yet
DOSL builder track
K-RERA registrations under this promoter
25
Marked completed
4
Past promised date, not completed
2
Complaints filed against the promoter
12
Developer's project loan
Not verified yet
Records searched to
Not verified yet
Building plan
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
HDFC · Fort Branch
Stage
Certified progress
Lapsed
Basemap: Esri, OpenStreetMap contributors
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Satori Residence By Genurise, price locked; Adarsh Rosewood, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Aydin Infra Signature 3, price locked.
This project
Padlock: that project's price is part of its own report