Environmental clearanceIssued 10 Jan 2018Filed as SEIAA, p. 1
6 pagesAvailable
1 pageAvailable
9 pages1 factAvailable
2 pages3 factsAvailable
2 pagesAvailable
1 pageAvailable
8 pagesAvailable
9 pages2 factsAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
Source: K-RERA project page and the documents filed there, as read by us. 3 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Lake Gardens in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Filed with the registration
Fire NOC
KSFES/NOC/603/2018
✓Clear
Environmental clearance
SEIAA 114 CON 2017 · issued 10 Jan 2018
✓Clear
Airport height NOC
issued 21 Sep 2016 · permissible top elevation 938.73 m above mean sea level · validity ended 20 Sep 2021
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
4
RERA completion date
30 May 2025
Registration certificates
PRM/KA/RERA/1251/446/PR/190525/002581
Land use
Conversion order
Not verified yet
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
Not verified yet
Water below ground
27.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
260 m
Distances
Within 3 km
Connectivity
Road distance from the site
Nuisances
Distance from the site
Lapsed
Quarterly return
Lapsed
Dates
Dates
Filed dates
Possession, agreement
31 Mar 2023
Schedule end
1 Sep 2022
RERA completion date
30 May 2025
×Red flag
Work began, as filed
1 Sep 2019
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹63.20 Cr 16.7%Development · ₹314.17 Cr 83.3%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹377.37 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold
Lapsed
Flats sold per quarter
Lapsed
K-RERA inventory
Lapsed
Compliance
Escrow
Lapsed
Escrow and filings
Escrow bank
HDFC · Manekji Wadia Buildingq
Designated account, collected
Not verified yet
Designated account, withdrawn
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
4
Track record
Average schedule slip
Not verified yet
DOSL builder track
Not verified yet
Developer's project loan
Not verified yet
Records searched to
Not verified yet
Building plan
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
HDFC · Manekji Wadia Buildingq
Stage
Certified progress
Lapsed
Basemap: Esri, OpenStreetMap contributors
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Satori Residence By Genurise, price locked; Adarsh Rosewood, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Aydin Infra Signature 3, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked.
This project
Padlock: that project's price is part of its own report