Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| AAROHANA PROJECTS |
| Apartment |
| 776–1,745 sqft carpet (as filed) |
| Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED | Apartment | 280–635 sqft carpet (as filed) | Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open DivyaSree Base Camp in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 27.9 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 500 m to the south-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
| Groundwater | Not verified yet | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | Not verified yet | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | 23.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 16.5 km, Airport City | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
| Kempegowda Airport | 23.6 | 25 | 16.8 |
| MG Road (CBD) | 49.0 | 48 | 42.2 |
| Manyata Tech Park | 44.2 | 44 | 34.3 |
| ITPL, Whitefield | 53.1 | 48 | 40.7 |
| Ecospace, Bellandur ORR | 63.7 | 61 | 46.9 |
| Electronic City Ph 1 | 68.9 | 73 | 56.5 |