Overview
ARS Zurich Phase-1
Part ofARS Zurich2 phases, 360 flats
Overview
Part ofARS Zurich2 phases, 360 flats
Overview
Part ofARS Zurich2 phases, 360 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 53 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open ARS Zurich Phase-1 in the interactive atlas
Approval or registration
Land use converted
DC OFFICE BANGALORE URBAN · Survey 105/1, 105/6
K-RERA filing, land schedule
Approval or registration
Land use converted
DC OFFICE BANGALORE URBAN · Survey 104/14, 104/15
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PANCHAYAT · Survey 104/14, 104/15, 105/1, 105/6
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PANCHAYAT · Survey 104/14, 104/15, 105/1, 105/6
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan APA/CC/552/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/230125/007431
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 17 Jan 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 104/14, 104/15, 105/1, 105/6 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 9,029 sq m | |
| Khata | E Khatha · PANCHAYAT · 19 Feb 2024 | |
| Building plan (Local Planning Authority) | Sanctioned 12 Dec 2024 · No. APA/CC/552/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/374/2024 · issued 13 Nov 2024 · building height 84.3 m | Clear |
| Environmental clearance | SEIAA 24 CON 2024 · EC identification no. EC24C3801KA5295997N · issued 11 Nov 2024 | Clear |
| Airport height NOC | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Apr 2027 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 104/14, 104/15 | Converted 28 Jul 2023 · DC OFFICE BANGALORE URBAN | |
| Sy 105/1, 105/6 | Converted 19 Jul 2023 · DC OFFICE BANGALORE URBAN | |
| Survey numbers | 104/14 · 104/15 · 105/1 · 105/6 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 103 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 104 | 1,105 |
| Sold, Q2 2026-27 | 38 / 104 | |
|---|---|---|
| Unsold, Q2 2026-27 | 66 | |
| Months to sell, derived from filed bookings | 24 months |
| Bilva Phase-II By Bhavisha Homes | about 0.5 km | Locked | |
|---|---|---|---|
| Suyug's Saffron | about 1 km | Locked | |
| Engrace Vista | about 1.5 km | Locked | |
| Engrace 4 | about 2 km | Locked | |
| Engrace 3 | about 2 km | Locked |
| ARS Zurich Phase-1 This project | This project is the point the others are measured from | 30 Apr 2027 | 37% (38 of 104) | Not verified yet |
|---|---|---|---|---|
| Bilva Phase-II By Bhavisha Homes | about 0.5 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
| Suyug's Saffron | about 1 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Electricity, built | 50% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (104 covered spaces for 104 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km |
|---|
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 1 Apr 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Mar 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 82% | |
| Completion, accountant | 71.7% of the estimated cost spent | |
| Possession, agreement | 30 Apr 2027 | |
|---|---|---|
| Schedule end | 31 Mar 2027 | |
| RERA completion date | 30 Apr 2027 | |
| Work began, as filed | 17 Dec 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 84.3 m on the fire NOC · 81.2 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 20 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/374/2024 · issued 13 Nov 2024 · building height 84.3 m | |
| Environmental clearance | SEIAA 24 CON 2024 · EC identification no. EC24C3801KA5295997N · issued 11 Nov 2024 | |
| Architect, quarterly | Form 5 · Jul 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 14 Dec 2024 · site inspected 13 Dec 2024 | |
| Engineer's certificate, registration | Dated 14 Dec 2024 | |
| Chartered accountant's certificate, registration | Dated 19 Dec 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost | ₹86.20 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹85.00 Cr | |
| Estimated cost, Form 4 Q4 2025-26 | ₹88.03 Cr | |
| Cost incurred | ₹63.13 Cr (71.7% of the estimate) | |
| Cost left | ₹24.91 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹17.38 Cr | |
| Land cost revision | Not verified yet | |
Sold (38) 36.5%Unsold (66) 63.5%
| Sold, Q3 2025-26 | 13 / 104 · 91 available | |
|---|---|---|
| Sold, Q4 2025-26 | 28 / 104 · 76 available | |
| Sold, Q1 2026-27 | 33 / 104 · 71 available | |
| Sold, Q2 2026-27 | 38 / 104 · 66 available | |
| Unsold, Q2 2026-27 | 66 | |
| Sold in Q4 2025-26 | 15 | |
| Sold in Q1 2026-27 | 5 | |
| Sold in Q2 2026-27 | 5 |
| Escrow bank | ICICI Bank · SARJAPURA | |
|---|---|---|
| Designated account, collected | ₹10.21 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹8.41 Cr in Q2 2026-27 (82% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹63,12,56,520 | |
| Net amount withdrawable, Form 4 | ₹41,15,20,148 | |
| Escrow account to date, Q4 2025-26 | ₹16.34 Cr deposited from sales, ₹16.20 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹21,97,36,372 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 17 Jan 2024 | Review |
| Building plan | Sanctioned 12 Dec 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · SARJAPURA | |

| Nambiar District 25 Phase 2 | about 2 km | Locked |
|---|
| Coevolve Florenza | about 3.5 km | Locked |
|---|
| Sowparnika Olivia Nest | about 3.5 km | Locked |
|---|
| Leafy Avenue | about 4 km | Locked |
|---|
| Vasudharini Nest | about 4 km | Locked |
|---|
| Royal Nest | about 4.5 km | Locked |
|---|
| Acorn Hive | about 5 km | Locked |
|---|
| Engrace Vista |
|---|
| about 1.5 km |
| 30 Dec 2028 |
| 46% (181 of 392) |
| Locked |
| Engrace 4 | about 2 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Engrace 3 | about 2 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Nambiar District 25 Phase 2 | about 2 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
|---|
| Projects within 4 km, counted | 71 (71 with an approximate location) | |
|---|---|---|
| Flats in them | 20,607 | |
| Booked | 10,970 of 20,607 (53%) | |
| Unsold | 9,637 | |
| Booked a month, pooled | 365 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 11 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 51 | 37 |
| MG Road (CBD) | 28 | 22 |
| Manyata Tech Park | 32 | 25.5 |
| ITPL, Whitefield | 18 | 13.5 |
| Ecospace, Bellandur ORR | 17 | 11.5 |
| Electronic City Ph 1 | 17.5 | 11 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2.5 km to the south-east, named Sarjapur Substation on OpenStreetMap |
|---|